Skip to main content
search

What types of meter are required for NEM?

Category: Net Energy Metering (NEM)

2 types of meter are required as below:

  1. TNB’s bi-directional meter (with import-export feature) to record the amount of electricity consumed, produced or exported;
  2. PV meter/data logger/inverter with monitoring feature to record the total amount of electricity generated by the PV system.

Optional – May install check meter for measurement of the energy export (if applicable) and shall be of the same or equivalent to the standards of the consumer meter installed at the premises by TNB;

Did you find this FAQ helpful?
0
0