The study will determine the technical impact to the Distribution Licensee’s electricity distribution network and establish technical and safety requirements that may be necessary for the installation.
The requirement is based on kWp of installation as below :
| Installed Capacity | Study Required | Fee of Study (RM) |
| 1 – 72 kWp | No | – |
| 72 kWp – 180 kWp | Yes | 1,000.00 |
| > 180 kWp – 425 kWp | Yes | 5,000.00 |
| > 425 kWp – 1 MWp | Yes | 8,000.00 |