Skip to main content
search

What is NEM Assessment Study (NEMAS)?

Category: Net Energy Metering (NEM)

The study will determine the technical impact to the Distribution Licensee’s electricity distribution network and establish technical and safety requirements that may be necessary for the installation.

The requirement is based on kWp of installation as below :

Installed Capacity Study Required Fee of Study (RM)
1 – 72 kWp No
72 kWp – 180 kWp Yes 1,000.00
> 180 kWp – 425 kWp Yes 5,000.00
> 425 kWp – 1 MWp Yes 8,000.00
Did you find this FAQ helpful?
0
0